Upcoming Projects

Sai Smriti

H Block 15th Main Road
  • STILT + 5 FLOORS
  • 6 units
  • 4 bhk
  • 2700 SQFT
Sai Smriti

Experience Unmatched Luxury and Comfort in the Heart of H Block, 15th Main Road

Come, be the first to discover Anna Nagar’s hottest new landmark for modern luxury living .

This project features two luxury urban homes that have the advan­tage of a prime location,coupled with up scale amenities and grand interiors. With bright and cozy living spaces the apartments come with modern finishes and surfaces, and are just minutes away from shop­ping, dining, entertainment and transportation. With a refreshing approach to modern city living, these luxury apartment homes, are in the best location in H Block, 15th Main Road.

Bang in H Block, 15th Main Road is thought fully designed apartment of 2700Sq.ft. The apartment has unmatched el­egance, style and sophistication.

Floor Plan

Design your dream space with confidence, starting with the perfect floor plan.

STILT
FLOOR PLAN

TYPICAL
FLOOR PLAN

TYPICAL
FLOOR PLAN

TYPICAL
FLOOR PLAN

TYPICAL
FLOOR PLAN

Shiela Greens

Features &
Specifications

Witness the pinnacle of innovation with our cutting-edge
functionalities and superior specifications.

SHREERAM VISWAS

STRUCTURE

RCC Framed Structure, Isolated Footing, Strip Raft or
Pile as Recommended by Soli Test Report /
Structural Consultant.

Anticorrosive Paint – Anti Corrosive Paint, Epoxy will
be applied for all the Foundation and upto Stilt Column
Level.

Steel Reinforcement – MT Bars – ISI Brand – Fe
500 – with Tested Certifiate,

Termite Treatment – Anti Termite will be done in Three
Different Stage – 1. Foundation Level, 2. Basement Level,
3. Ground level Building

SHREERAM VISWAS

PLASTERING

RCC Framed Structure, Isolated Footing, Strip Raft or
Pile as Recommended by Soli Test Report /
Structural Consultant.

Anticorrosive Paint – Anti Corrosive Paint, Epoxy will
be applied for all the Foundation and upto Stilt Column
Level.

Steel Reinforcement – MT Bars – ISI Brand – Fe
500 – with Tested Certifiate,

Termite Treatment – Anti Termite will be done in Three
Different Stage – 1. Foundation Level, 2. Basement Level,
3. Ground level Building

SHREERAM VISWAS

FLOORING

RCC Framed Structure, Isolated Footing, Strip Raft or
Pile as Recommended by Soli Test Report /
Structural Consultant.

Anticorrosive Paint – Anti Corrosive Paint, Epoxy will
be applied for all the Foundation and upto Stilt Column
Level.

Steel Reinforcement – MT Bars – ISI Brand – Fe
500 – with Tested Certifiate,

Termite Treatment – Anti Termite will be done in Three
Different Stage – 1. Foundation Level, 2. Basement Level,
3. Ground level Building

SHREERAM VISWAS

MASONRY WORKS

RCC Framed Structure, Isolated Footing, Strip Raft or
Pile as Recommended by Soli Test Report /
Structural Consultant.

Anticorrosive Paint – Anti Corrosive Paint, Epoxy will
be applied for all the Foundation and upto Stilt Column
Level.

Steel Reinforcement – MT Bars – ISI Brand – Fe
500 – with Tested Certifiate,

Termite Treatment – Anti Termite will be done in Three
Different Stage – 1. Foundation Level, 2. Basement Level,
3. Ground level Building

SHREERAM VISWAS

TOILET FITTINGS

RCC Framed Structure, Isolated Footing, Strip Raft or
Pile as Recommended by Soli Test Report /
Structural Consultant.

Anticorrosive Paint – Anti Corrosive Paint, Epoxy will
be applied for all the Foundation and upto Stilt Column
Level.

Steel Reinforcement – MT Bars – ISI Brand – Fe
500 – with Tested Certifiate,

Termite Treatment – Anti Termite will be done in Three
Different Stage – 1. Foundation Level, 2. Basement Level,
3. Ground level Building

SHREERAM VISWAS

PAINTING

RCC Framed Structure, Isolated Footing, Strip Raft or
Pile as Recommended by Soli Test Report /
Structural Consultant.

Anticorrosive Paint – Anti Corrosive Paint, Epoxy will
be applied for all the Foundation and upto Stilt Column
Level.

Steel Reinforcement – MT Bars – ISI Brand – Fe
500 – with Tested Certifiate,

Termite Treatment – Anti Termite will be done in Three
Different Stage – 1. Foundation Level, 2. Basement Level,
3. Ground level Building

SHREERAM VISWAS

JOINERIES

RCC Framed Structure, Isolated Footing, Strip Raft or
Pile as Recommended by Soli Test Report /
Structural Consultant.

Anticorrosive Paint – Anti Corrosive Paint, Epoxy will
be applied for all the Foundation and upto Stilt Column
Level.

Steel Reinforcement – MT Bars – ISI Brand – Fe
500 – with Tested Certifiate,

Termite Treatment – Anti Termite will be done in Three
Different Stage – 1. Foundation Level, 2. Basement Level,
3. Ground level Building

Amenities

Experience luxury living at its finest with our unparalleled amenities.

Smart Home Automation Solution

6 Passengers Lift with Automatic

Video Door Phone

Automatic Water Level Indicator

Smart Home Automation Solution

6 Passengers Lift with Automatic

Video Door Phone

Automatic Water Level Indicator

Shruthi

Location
Advantage

J BLOCK – Anna Nagar East

IT Hubs

  • Lorem ipsum dolor sit – 950m
  • Been the industry’s standard – 1.3 kms
  • Make a type specimen book – 4 kms
  • Essentially unchanged – 5 kms
  • Aldus PageMaker including versions – 6 kms

Schools

  • Lorem ipsum dolor sit – 950m
  • Been the industry’s standard – 1.3 kms
  • Make a type specimen book – 4 kms
  • Essentially unchanged – 5 kms
  • Aldus PageMaker including versions – 6 kms

Hospitals

  • Lorem ipsum dolor sit – 950m
  • Been the industry’s standard – 1.3 kms
  • Make a type specimen book – 4 kms
  • Essentially unchanged – 5 kms
  • Aldus PageMaker including versions – 6 kms

Transportation Hub

  • Lorem ipsum dolor sit – 950m
  • Been the industry’s standard – 1.3 kms
  • Make a type specimen book – 4 kms
  • Essentially unchanged – 5 kms
  • Aldus PageMaker including versions – 6 kms

Project Status

Witness the transformation unfold with our live project updates.

SL.NO Flats Area UDS Type Floor Status
1 1A 1674.5 660 2BHK 1st FLOOR SOLD
2 1B 862.5 340 1BHK 1st FLOOR SOLD
3 2 2537 500 3BHK 2nd FLOOR SOLD
4 3 2537 500 3BHK 3rd FLOOR UN SOLD
5 4 2537 1000 4BHK 4th FLOOR SOLD
6 5 2537 1000 4BHK 5th FLOOR UN SOLD
Will be update soon

May 2024