Brindavanam April 2025
NavtojAdmin
2025-05-15T10:41:32+00:00
Ongoing Project
Brindavanam
H Block Anna Nagar
STILT + 5 FLOORS
8 units
3BHK
1900 SQFT
April 2025
3rd floor above lintel brick work
2nd floor electrical conduit line laying1
2nd floor electrical conduit line laying
2B ceiling plastering
2A ceiling plastering
Staircase wall electrical wall chasing
2nd floor fiber mesh fixing
2B bathroom wall plastering
2B wall plastering
2A wall plastering
5th floor slab and beam reinforcement
5th floor slab electrical conduit line laying