Ongoing Projects
Sri Chakra
Y Block Anna Nagar
STILT + 5 FLOORS
8 units
4 bhk
2700 SQFT
July 2025
1A pending electrical work
5b granite work
Lobby window and wall plastering
Inside ramp area leveling and retaining wall Earth work
Solar panel fixing
Compound wall lintel beam RCC completed
Staircase handrail work
Lift door frame fixing
Carpark ceiling plaster work in progress
1B bathroom granite laying
Safety barricade fixing
1A bathroom granite work
Elevation electrical wire pulling
Main gate chanel brick pillar
EB room block work
Lift inner wall plastering
Compound wall brick work completed
Staircase flight side plaster
Lift inside door wall plastering
Bathroom jamline granite laying
Page load link
Go to Top
Home
Our Story
Ongoing
Upcoming
Completed
Joint Ventures
Testimonials
More
CAREERS
News & Events
Lets Talk
Menu
Close
Close
Home
About Us
Ongoing
Upcoming
Completed
Joint Venture
Channel Partners
News Events
testimonials
Careers
Contact Us
Call Us
Enquiry
Site Visit
Menu